Don Pedro Dam Trolley
Tuolumne County, CA
- Project Type: Fab/Install
- Project Location: Fabrication Shop Build Out - Tuolumne County, CA
- Project Owner: Konecranes
- Project Completed: q1-q2 2023
- Project Size: RI supplied detailed fabrication prints, steel and labor to fabricate, paint and test 1 22x19’ trolley base with a complete house attachment totaling 42,013 lbs
- RI Division: Fabrication, Field
- Project Manager: Mark Bravo (Fabrication), Chad Norris (Installation)
- Foreman/Superintendent: Mark Bravo (Fabrication), Chuck Everret (Installation)
- Project Engineer: Charlie Hicks
-
Project Description:
This project was a large under taking as there are multiple critical dimensions points that have to be check after every weld segment is completed. In order to ensure the trolley base is with in structural tolerance and can be milled without being reworked. This not only sharped our skill set in regards to multiple halves meeting and fitting perfectly together but it allowed multiple divisions to work harmoniously in order to achieve one common goal. A satisfied customer!

Mark Bravo (Fabrication), Chad Norris (Installation)
Project Manager

Mark Bravo (Fabrication), Chuck Everret (Installation)
Foreman/Superintendent