FMI Miami

Smelter Expansion

Our participation in this project included structural steel fabrication and coatings, steel erection, piping systems, large diameter ducting, concrete containment coatings, demolition of existing 220’ tall gas stack and installation of new tail gas stack in Miami, AZ. Around the clock schedule with 125 person crew size.

Project Value: $6.5 Million

FMI Copper & Gold Miami Mine

4242 US-60 Claypool, AZ 85532

Foot Tall Stack